Home » Technical reports

Technical reports

Each phase of the project concludes with the budget and a synthetic scientific report (both in Romanian).

Phase 1: 01.07.2022 – 13.12.2022

  • Scientific report (RST-1)

Phase 2: 14.12.2022-13.12.2023

  • Scientific report (RST-2)

Phase 3: 14.12.2023-30.06.2024

  • Scientific report (RST-3)

Final: 30.06.2024